Gold bearing waste recycling equipment

Gold bearing waste recycling equipment

Model No.︰gold-a

Brand Name︰hongxin

Country of Origin︰-

Unit Price︰CNY ¥ 6000 / pc

Minimum Order︰1 pc

Inquire Now

Product Description

Equipment introduction

Gold-plated PCB and electroplating enterprise production process line and heavy gold wire scrap liquid or contain the goldwater washing wastewater, the gold bearing waste water produced by this process, the gold content is higher scrap liquid and the first washing wastewater containing gold (gold content is about 0.1 ~ 0.2 g/L) to the enterprises with recycling qualification towed processing or electrolytic recovery machine, and the name of the second and third washing water, because of the large gold content is too low and the water barrel or electrolytic method can't recovery, now generally discharged into waste water station in the form of environmental protection mud settling down in the end.

The above two kinds of processing way more intermediate processing link, the recycling of gold loss is bigger, and the gold valuation is not high, in the environmental protection mud gold due to the low content of basic not denominated, thus cannot obtain economic benefits.

Gold resin absorption recovery system for PCB plating line and heavy gold electroplating enterprises produce the rinse water or recycled water electrolysis machine, using the principle of ion exchange, gold of gold bearing waste water recycling, the equipment cover an area of an area small, simple operation, low maintenance cost. Gold recovery system for PCB enterprise electric gold or gold chemical production line cleaning gold plate cleaning after discharge of wastewater containing gold for gold recovery, use a dedicated gold resin absorption, ion exchange method is used to selectively to gold out of the rinse water recycling, the economic benefits of recovery of gold is very considerable.

Gold recovery system cover an area of an area small, corrosion resistance, anti-aging, light weight, easy to transport installation, operation management, low maintenance cost, for each big, medium and small enterprise to use.

Design size

 

Area: 2 square meters;

State of the recovery of gold: resin gold;

Gold recovery: > 99%.

Gold water content: < 0.01 PPM

 

The equipment we can provide free equipment, installation, maintenance, refining, profit sharing.